Full-process installation service for large-scale amusement facilities
Let the professional team accurately implement the joy
On-site survey|The first step of scientific planning
• Professional surveying team conducts on-site survey with laser rangefinder • Generates "Site Suitability Analysis Report" (including geological/climate/people flow data) • 3D modeling predicts the feasibility of equipment installation
Acceptance and delivery|Strict standards to ensure operation
• Five-dimensional acceptance system: Structural stability test (carrying 200% design load) Electrical safety test (insulation resistance > 5MΩ) Surface flatness test (error < 0.3mm) Noise decibel test (< 55dB) User experience evaluation (invite 10 groups of families to try) • Delivery of "Equipment Operation Manual" and "Emergency Treatment Plan
Scheme design|Tailor-made installation drawings
• Issues "Equipment Installation Wiring Diagram" and "Foundation Construction Specifications" • Plans safety buffer zone/equipment linkage lines • Provides embedded parts list (accuracy ±0.5cm)
Operation and maintenance service | Long-term protection of happiness
• Smart operation and maintenance platform: real-time monitoring of equipment operation status • Annual maintenance plan: provide 4 in-depth maintenance services • Emergency response mechanism: respond within 2 hours, on-site processing within 48 hours • Upgrade support: free access to annual new product catalog
Construction and installation|Precision quality is visible
• Triple guarantee team:
Core technicians (more than 10 years of experience in amusement equipment installation) Safety supervision (with international safety certification) Emergency team (7×24h standby)
• Intelligent installation equipment: UAV-assisted high-altitude positioning Precise docking of hydraulic lifting platform AR-assisted installation calibration system
Unpacking verification Check the parts against the "Equipment List" Confirm that the "Installation Drawing" matches the actual object Check the tool kit (including professional tools such as torque wrench/level) Site confirmation Review the foundation size (error <2cm) Check the ground flatness (≤3mm/2m) Confirm the positioning of embedded parts (deviation <5mm) Safety training Watch the "Safe Operation Video" Learn the "High-altitude Operation Specifications" Wear a full set of protective equipment
Detailed explanation of installation steps
STEP1 Foundation construction • Cast C30 concrete foundation (curing period ≥7 days) • Install embedded parts (uniform exposed length of threads) • Apply anti-slip coating to the foundation surface STEP2 Main body installation • Assemble the steel frame (down first, then up, diagonally tighten) • Lifting platform (use balance beam + four-point lifting) • Connect the slide (grind and polish the joints) STEP3 Accessory installation • Fix the guardrail (gap ≤ 6cm) • Install the buffer layer (EPDM rubber thickness ≥ 3cm) • Wiring test (insulation resistance > 20MΩ)
Commissioning and acceptance
Functional test Run no-load test (continuous operation for 2h) Check the emergency stop function Verify the accuracy of the load sensor Safety check Detect sharp corners (use radius gauge) Measure ground resistance (≤ 4Ω) Check the clarity of warning signs Acceptance and delivery Sign the "Equipment Acceptance Form" Get the "Electronic Warranty Card" Join the VIP operation and maintenance group
Safety precautions
• Wear a double-hook safety belt for aerial work • Fire blanket for welding work • Suspend outdoor work in strong winds/rainy days • Conduct safety briefing before daily installation
Bonus tool kit: • AR installation guidance APP (scan the code to get 3D guidance) • Multi-language "Troubleshooting Manual" • Emergency contact phone card (including direct dialing of the technical director)
Construct according to the drawings, step by step, and let professional guidance achieve perfect implementation!